Actions from the April 2024, meeting

3-B-24-DT Approve subject to conditions

APPROVE Certificate 3-B-24-DT, subject to one condition: 1) illumination to be limited to push-through letters or graphics (illuminating the individual letters instead of the white scroll backer panels).


4-B-24-DT Approve as requested

APPROVE Certificate 4-B-24-DT as submitted.


4-C-24-DT Approve as requested

APPROVE Certificate 4-C-24-DT as submitted.


4-F-24-DT Approve as requested

4-A-24-IH Approved With Conditions

APPROVE Certificate 4-A-24-IH, subject to the following conditions: 1) meeting all relevant standards of Section 4.6, Middle Housing standards; 2) meeting City Engineering standards.


4-B-24-IH Approved With Conditions

APPROVE Certificate 4-B-24-IH for the new driveway, subject to meeting City Engineering requirements; APPROVE the new front porch, subject to the following condition: 1) removal of horizontal railing and installation of vertical posts to meet design guidelines.


4-C-24-IH Approved With Conditions

APPROVE Certificate 4-C-24-IH, subject to the following condition: 1) final site plan to meet City Engineering standards; 2) removal of front shutters.


4-D-24-IH Approved With Conditions

APPROVE Certificate 4-D-4-IH, subject to the following conditions: 1) front setback to be revised to align with adjacent house and blockface; 2) foundation to measure at least 12" tall; 3) proposed acrylic coating cladding to be replaced with brick or lap siding.


4-A-24-IH Approved With Conditions

APPROVE Certificate 4-A-24-IH, subject to the following conditions: 1) meeting all relevant standards of Section 4.6, Middle Housing standards; 2) meeting City Engineering standards.


4-B-24-IH Approved With Conditions

APPROVE Certificate 4-B-24-IH for the new driveway, subject to meeting City Engineering requirements; APPROVE the new front porch, subject to the following condition: 1) removal of horizontal railing and installation of vertical posts to meet design guidelines.


4-C-24-IH Approved With Conditions

APPROVE Certificate 4-C-24-IH, subject to the following condition: 1) final site plan to meet City Engineering standards; 2) removal of front shutters.


4-D-24-IH Approved With Conditions

APPROVE Certificate 4-D-4-IH, subject to the following conditions: 1) front setback to be revised to align with adjacent house and blockface; 2) foundation to measure at least 12" tall; 3) proposed acrylic coating cladding to be replaced with brick or lap siding.