Details of Action
−
+
1. Obtaining approval from the Tennessee Technology Corridor Development Authority (TTCDA) for the proposed development.
2. Providing an unrestricted vehicular access connection for this development from Centerpoint Dr. to Yarnell Rd. for public use. The roadway shall meet public street design standards.
3. Providing for a public access connection between this development and Carmichael Rd. if an alternative connection is not made.
4. Obtaining approval from the Knox County Board of Zoning Appeals for a variance on a reduction of the area of a parking stall, from 200 square feet to 180 square feet.
5. Meeting all applicable requirements of the Knox County Zoning Ordinance.
6. Meeting all applicable requirements of the Knox County Department of Engineering and Public Works.
7. Connecting the development to sanitary sewer, as well as meeting other applicable requirements of the Knox County Health Department.
8. Installing all landscaping, as shown on the landscape plan, within six months of issuance of occupancy permits for the project, or posting a bond with the Knox County Department of Engineering and Public Works, to guarantee such installation.
9. Obtaining approval of and recording a final plat resubdividing the property to create a single lot, or multiple lots meeting the Minimum Subdivision Regulations for the office park site.
With the conditions noted above, this request meets the requirements for approval in the BP (Business and Technology) zoning district, as well as other criteria for approval of a use on review.
Property Information
−
+
Location0 Centerpoint Blvd
West side of Centerpoint Blvd., north of Lovell Rd.
Commission District 6
Size7.90 acres
SectorLand Use Designation? O, MU & SLPA
Currently on the Property
Vacant land
Growth PlanPlanned Growth Area
- Utilities
SewerWest Knox Utility District
WaterWest Knox Utility District
Case Notes
−
+
Staff Recommendation
APPROVE the development plan for the office park in the BP (Business and Technology) zoning district, subject to 9 conditions:
1. Obtaining approval from the Tennessee Technology Corridor Development Authority (TTCDA) for the proposed development.
2. Providing an unrestricted vehicular access connection for this development from Centerpoint Dr. to Yarnell Rd. for public use. The roadway shall meet public street design standards.
3. Providing for a public access connection between this development and Carmichael Rd. if an alternative connection is not made.
4. Obtaining approval from the Knox County Board of Zoning Appeals for a variance on a reduction of the area of a parking stall, from 200 square feet to 180 square feet.
5. Meeting all applicable requirements of the Knox County Zoning Ordinance.
6. Meeting all applicable requirements of the Knox County Department of Engineering and Public Works.
7. Connecting the development to sanitary sewer, as well as meeting other applicable requirements of the Knox County Health Department.
8. Installing all landscaping, as shown on the landscape plan, within six months of issuance of occupancy permits for the project, or posting a bond with the Knox County Department of Engineering and Public Works, to guarantee such installation.
9. Obtaining approval of and recording a final plat resubdividing the property to create a single lot, or multiple lots meeting the Minimum Subdivision Regulations for the office park site.
With the conditions noted above, this request meets the requirements for approval in the BP (Business and Technology) zoning district, as well as other criteria for approval of a use on review.
Disposition Summary
APPROVE the development plan for the office park in the BP (Business and Technology) zoning district, subject to 9 conditions:
Details of Action
1. Obtaining approval from the Tennessee Technology Corridor Development Authority (TTCDA) for the proposed development.
2. Providing an unrestricted vehicular access connection for this development from Centerpoint Dr. to Yarnell Rd. for public use. The roadway shall meet public street design standards.
3. Providing for a public access connection between this development and Carmichael Rd. if an alternative connection is not made.
4. Obtaining approval from the Knox County Board of Zoning Appeals for a variance on a reduction of the area of a parking stall, from 200 square feet to 180 square feet.
5. Meeting all applicable requirements of the Knox County Zoning Ordinance.
6. Meeting all applicable requirements of the Knox County Department of Engineering and Public Works.
7. Connecting the development to sanitary sewer, as well as meeting other applicable requirements of the Knox County Health Department.
8. Installing all landscaping, as shown on the landscape plan, within six months of issuance of occupancy permits for the project, or posting a bond with the Knox County Department of Engineering and Public Works, to guarantee such installation.
9. Obtaining approval of and recording a final plat resubdividing the property to create a single lot, or multiple lots meeting the Minimum Subdivision Regulations for the office park site.
With the conditions noted above, this request meets the requirements for approval in the BP (Business and Technology) zoning district, as well as other criteria for approval of a use on review.