Details of Action
−
+
1. Connection to sanitary sewer and meeting any other relevant requirements of the Knox County Health Department.
2. Provision of a street name which is consistent with the Uniform Street Naming and Addressing System within Knox County (County Ord. 91-1-102)
3. Meeting all applicable requirements of the Knox County Department of Engineering and Public Works.
4. Meeting all applicable requirements and obtaining all required permits from the Tennessee Department of Environment and Conservation (Tennessee Valley Authority, U.S. Army Corps of Engineers).
5. Certification on the final plat by the applicant's surveyor that there is sight distance at the intersection of the proposed JPE with Harvey Rd. meets or exceeds the minimum required by the Subdivision Regulations
6. Place a note on the final plat that all lots in this subdivision and the Robertson property will have access only to the JPE that is being constructed as part of this project
7. In order to prevent vehicular use place a physical barrier at either end of the cut-off section of the Robertson driveway that intersects with Harvey Rd. and the proposed JPE and is adjacent to parcel 162-02943
8. Prior to final plat approval, the Board of First Utility District granting the applicant an access easement for the purpose of constructing the joint permanent easement as shown on this concept plan
9. Prior to final plat certification, record the required access easement across the First Utility District property (162-02941)
10. Prior to certification of the final plat for the subdivision, establishing a property owners association that will be responsible for maintenance of the joint permanent easements, common area and drainage system
11. Construction of the joint permanent eaement with a pavement widthof 22' as required by the Subdivision Regulations
12. Prior to final plat approval, the Knox County Commission approving the rezoning of this site (8-B-16-RZ) to PR (Planned Residential) Zone at a density high enough to meet or exceed the development density proposed by this concept plan/use on review
13. A final plat application based on this concept plan will not be accepted for review by the MPC until certification of design plan approval has been submitted to the MPC staff.
Property Information
−
+
Location12710 Raby Way
Northeast side of Harvey Rd., southeast of Boyd Station Rd., and north of Mallard Bay Dr.
Commission District 5
Census Tract 58.12
Size15.28 acres
Sector
Currently on the Property
Vacant land
Growth PlanPlanned Growth Area
- Utilities
ElectricityLenoir City Utility District
Natuarl GasKnoxville Utilities Board
SewerFirst Knox Utility District
TelephoneAT&T
WaterFirst Knox Utility District
Case Notes
−
+
Staff Recommendation
APPROVE variances 1 & 2 because the site's topography restricts compliance with the Subdivision Regulations, and the proposed variances will not create a traffic hazard.
APPROVE the Concept Plan subject to 13 conditions:
1. Connection to sanitary sewer and meeting any other relevant requirements of the Knox County Health Department.
2. Provision of a street name which is consistent with the Uniform Street Naming and Addressing System within Knox County (County Ord. 91-1-102)
3. Meeting all applicable requirements of the Knox County Department of Engineering and Public Works.
4. Meeting all applicable requirements and obtaining all required permits from the Tennessee Department of Environment and Conservation (Tennessee Valley Authority, U.S. Army Corps of Engineers).
5. Certification on the final plat by the applicant's surveyor that there is sight distance at the intersection of the proposed JPE with Harvey Rd. meets or exceeds the minimum required by the Subdivision Regulations
6. Place a note on the final plat that all lots in this subdivision and the Robertson property will have access only to the JPE that is being constructed as part of this project
7. In order to prevent vehicular use place a physical barrier at either end of the cut-off section of the Robertson driveway that intersects with Harvey Rd. and the proposed JPE and is adjacent to parcel 162-02943
8. Prior to final plat approval, the Board of First Utility District granting the applicant an access easement for the purpose of constructing the joint permanent easement as shown on this concept plan
9. Prior to final plat certification, record the required access easement across the First Utility District property (162-02941)
10. Prior to certification of the final plat for the subdivision, establishing a property owners association that will be responsible for maintenance of the joint permanent easements, common area and drainage system
11. Construction of the joint permanent eaement with a pavement widthof 22' as required by the Subdivision Regulations
12. Prior to final plat approval, the Knox County Commission approving the rezoning of this site (8-B-16-RZ) to PR (Planned Residential) Zone at a density high enough to meet or exceed the development density proposed by this concept plan/use on review
13. A final plat application based on this concept plan will not be accepted for review by the MPC until certification of design plan approval has been submitted to the MPC staff.
Disposition Summary
APPROVE variances 1 & 2 because the site's topography restricts compliance with the Subdivision Regulations, and the proposed variances will not create a traffic hazard.
APPROVE the Concept Plan subject to 13 conditions:
Details of Action
1. Connection to sanitary sewer and meeting any other relevant requirements of the Knox County Health Department.
2. Provision of a street name which is consistent with the Uniform Street Naming and Addressing System within Knox County (County Ord. 91-1-102)
3. Meeting all applicable requirements of the Knox County Department of Engineering and Public Works.
4. Meeting all applicable requirements and obtaining all required permits from the Tennessee Department of Environment and Conservation (Tennessee Valley Authority, U.S. Army Corps of Engineers).
5. Certification on the final plat by the applicant's surveyor that there is sight distance at the intersection of the proposed JPE with Harvey Rd. meets or exceeds the minimum required by the Subdivision Regulations
6. Place a note on the final plat that all lots in this subdivision and the Robertson property will have access only to the JPE that is being constructed as part of this project
7. In order to prevent vehicular use place a physical barrier at either end of the cut-off section of the Robertson driveway that intersects with Harvey Rd. and the proposed JPE and is adjacent to parcel 162-02943
8. Prior to final plat approval, the Board of First Utility District granting the applicant an access easement for the purpose of constructing the joint permanent easement as shown on this concept plan
9. Prior to final plat certification, record the required access easement across the First Utility District property (162-02941)
10. Prior to certification of the final plat for the subdivision, establishing a property owners association that will be responsible for maintenance of the joint permanent easements, common area and drainage system
11. Construction of the joint permanent eaement with a pavement widthof 22' as required by the Subdivision Regulations
12. Prior to final plat approval, the Knox County Commission approving the rezoning of this site (8-B-16-RZ) to PR (Planned Residential) Zone at a density high enough to meet or exceed the development density proposed by this concept plan/use on review
13. A final plat application based on this concept plan will not be accepted for review by the MPC until certification of design plan approval has been submitted to the MPC staff.