Details of Action
−
+
1. Meeting all applicable requirements of the Knoxville Dept. of Engineering.
2. Compaction of fill areas to be done in accordance with the requirements of the Knoxville Dept. of Engineering.
3. Connection to sanitary sewer and meeting any other relevant requirement of the Knox County Health Dept.
4. Meeting all applicable requirements and obtaining all required permits from the Tenn. Dept. of Environment and Conservation.
5. Place a note on the final plat that all structures will have to be located at least 50' from the top of the sinkholes (closed contour areas) on this site
6. A final plat based on this concept plan will not be accepted for review by MPC until certification of design plan has been submitted to MPC staff.
Property Information
−
+
LocationWest end of Fox Cove Rd., west of Fox Rd., north of Tan Rara Dr.
Council District 2
Census Tract 58.04
Size31.70 acres
Sector
Currently on the Property
Vacant land
Growth PlanUrban Growth Area (Inside City Limits)
- Utilities
ElectricityLenoir City Utility District
Natuarl GasKnoxville Utilities Board
SewerFirst Knox Utility District
TelephoneAT&T
WaterFirst Knox Utility District
Case Notes
−
+
Staff Recommendation
APPROVE variances 1 & 2 because the site's topography restricts compliance with the Subdivision Regulations, and the proposed variances will not create a traffic hazard
APPROVE the concept plan subject to 6 conditions
1. Meeting all applicable requirements of the Knoxville Dept. of Engineering.
2. Compaction of fill areas to be done in accordance with the requirements of the Knoxville Dept. of Engineering.
3. Connection to sanitary sewer and meeting any other relevant requirement of the Knox County Health Dept.
4. Meeting all applicable requirements and obtaining all required permits from the Tenn. Dept. of Environment and Conservation.
5. Place a note on the final plat that all structures will have to be located at least 50' from the top of the sinkholes (closed contour areas) on this site
6. A final plat based on this concept plan will not be accepted for review by MPC until certification of design plan has been submitted to MPC staff.
Disposition Summary
APPROVE variances 1 & 2 because the site's topography restricts compliance with the Subdivision Regulations, and the proposed variances will not create a traffic hazard
APPROVE the concept plan subject to 6 conditions
Details of Action
1. Meeting all applicable requirements of the Knoxville Dept. of Engineering.
2. Compaction of fill areas to be done in accordance with the requirements of the Knoxville Dept. of Engineering.
3. Connection to sanitary sewer and meeting any other relevant requirement of the Knox County Health Dept.
4. Meeting all applicable requirements and obtaining all required permits from the Tenn. Dept. of Environment and Conservation.
5. Place a note on the final plat that all structures will have to be located at least 50' from the top of the sinkholes (closed contour areas) on this site
6. A final plat based on this concept plan will not be accepted for review by MPC until certification of design plan has been submitted to MPC staff.