Details of Action
−
+
1. Meeting all applicable requirements of the Knox County Health Department.
2. Providing a turnaround at the north end of the Joint Permanent Easement (JPE) that meets the requirements of Knox County Department of Engineering and Public Works.
3. Meeting all applicable requirements of Knox County Department of Engineering and Public Works.
4. Revising the lot line between Lots 6 and 9 so that Lot 9 has at least a minimum of 25' of frontage on the JPE.
5. Placing a note on the final plat that all structures will have to be located at least 50' from the top of the sinkholes (closed contour area) identified on the plat. Construction within the 50' setback may be permitted if a geotechnical study prepared by a registered engineer states that building within the 50' sinkhole buffer is acceptable and the study is approved by the Knox County Department of Engineering and Public Works. Construction is not permitted within the hatchered contour area of the sinkhole. Engineered footings may be required for any structures within the 50' sinkhole buffer.
6. Certification on the final plat by the applicant's surveyor that there is 300 feet of sight distance in both directions along Wooddale Church Rd. at the JPE and at the driveway location for Lot 8.
7. Place a note on the final plat that Lots 2R-1, 6, 7 and 9 will have access only to the JPE.
Property Information
−
+
LocationNorth side of Wooddale Church Rd., east side of Corum Rd.
Commission District 8
Size10.57 acres
Sector
Currently on the Property
Residence
Growth PlanPlanned Growth Area
- Utilities
ElectricityKnoxville Utilities Board
Natuarl GasKnoxville Utilities Board
SewerSeptic systems
TelephoneMetro Group Bell South Telephone
WaterKnoxville Utilities Board
Case Notes
−
+
Staff Recommendation
APPROVE the Concept Plan subject to 7 conditions
1. Meeting all applicable requirements of the Knox County Health Department.
2. Providing a turnaround at the north end of the Joint Permanent Easement (JPE) that meets the requirements of Knox County Department of Engineering and Public Works.
3. Meeting all applicable requirements of Knox County Department of Engineering and Public Works.
4. Revising the lot line between Lots 6 and 9 so that Lot 9 has at least a minimum of 25' of frontage on the JPE.
5. Placing a note on the final plat that all structures will have to be located at least 50' from the top of the sinkholes (closed contour area) identified on the plat. Construction within the 50' setback may be permitted if a geotechnical study prepared by a registered engineer states that building within the 50' sinkhole buffer is acceptable and the study is approved by the Knox County Department of Engineering and Public Works. Construction is not permitted within the hatchered contour area of the sinkhole. Engineered footings may be required for any structures within the 50' sinkhole buffer.
6. Certification on the final plat by the applicant's surveyor that there is 300 feet of sight distance in both directions along Wooddale Church Rd. at the JPE and at the driveway location for Lot 8.
7. Place a note on the final plat that Lots 2R-1, 6, 7 and 9 will have access only to the JPE.
Disposition Summary
APPROVE the Concept Plan subject to 7 conditions
Details of Action
1. Meeting all applicable requirements of the Knox County Health Department.
2. Providing a turnaround at the north end of the Joint Permanent Easement (JPE) that meets the requirements of Knox County Department of Engineering and Public Works.
3. Meeting all applicable requirements of Knox County Department of Engineering and Public Works.
4. Revising the lot line between Lots 6 and 9 so that Lot 9 has at least a minimum of 25' of frontage on the JPE.
5. Placing a note on the final plat that all structures will have to be located at least 50' from the top of the sinkholes (closed contour area) identified on the plat. Construction within the 50' setback may be permitted if a geotechnical study prepared by a registered engineer states that building within the 50' sinkhole buffer is acceptable and the study is approved by the Knox County Department of Engineering and Public Works. Construction is not permitted within the hatchered contour area of the sinkhole. Engineered footings may be required for any structures within the 50' sinkhole buffer.
6. Certification on the final plat by the applicant's surveyor that there is 300 feet of sight distance in both directions along Wooddale Church Rd. at the JPE and at the driveway location for Lot 8.
7. Place a note on the final plat that Lots 2R-1, 6, 7 and 9 will have access only to the JPE.