Recommended for approval
by the Planning Commission

APPROVE variances 1-3 because the site is affected by topographic constraints, and the proposed variances will not create a traffic hazard.
APPROVE the Concept Plan subject to 8 conditions:


See case notes below

Details

Request

Property Info

Case Notes

What's next?

Details of Action

+
1. Connection to sanitary sewer and meeting any other relevant requirements of the Knox County Health Department.
2. Provision of street names which are consistent with the Uniform Street Naming and Addressing System within Knox County (County Ord. 91-1-102).
3. Revising the concept plan to identify the future development area as Lot 14.
4. Meeting all applicable requirements of the Knox County Department of Engineering and Public Works.
5. Certification on the final plat by the applicant's surveyor that there is 300 feet of sight distance in both directions along Nubbin Ridge Rd.
6. Place a note on the final plat that all lots will have access only to the internal street system.
7. Meeting all requirements of the approved use on review development plan.
8. A final plat application based on this concept plan will not be accepted for review by the MPC until certification of design plan approval has been submitted to the MPC staff.

Applicant Request

+
Subdivision
CTL Summit, Phase II
Lots
14 (Split)

Variances

1. Vertical curve variance at station 0+40, from 250' to 80'.
2. Vertical curve variance at station 2+80, from 325' to 200'.
3. Intersection grade variance, from 1% to 2%.


Property Information

+
Location
North side of Nubbin Ridge Rd, east of Ferncliff Way.

Commission District 5


Size
3.83 acres

Sector
Southwest County

Currently on the Property
Single-family residence and vacant land

Growth Plan
Planned Growth Area

Case Notes

+
Staff Recommendation
APPROVE variances 1-3 because the site is affected by topographic constraints, and the proposed variances will not create a traffic hazard.

APPROVE the Concept Plan subject to 8 conditions:

1. Connection to sanitary sewer and meeting any other relevant requirements of the Knox County Health Department.
2. Provision of street names which are consistent with the Uniform Street Naming and Addressing System within Knox County (County Ord. 91-1-102).
3. Revising the concept plan to identify the future development area as Lot 14.
4. Meeting all applicable requirements of the Knox County Department of Engineering and Public Works.
5. Certification on the final plat by the applicant's surveyor that there is 300 feet of sight distance in both directions along Nubbin Ridge Rd.
6. Place a note on the final plat that all lots will have access only to the internal street system.
7. Meeting all requirements of the approved use on review development plan.
8. A final plat application based on this concept plan will not be accepted for review by the MPC until certification of design plan approval has been submitted to the MPC staff.
Disposition Summary
APPROVE variances 1-3 because the site is affected by topographic constraints, and the proposed variances will not create a traffic hazard.
APPROVE the Concept Plan subject to 8 conditions:

Details of Action
1. Connection to sanitary sewer and meeting any other relevant requirements of the Knox County Health Department.
2. Provision of street names which are consistent with the Uniform Street Naming and Addressing System within Knox County (County Ord. 91-1-102).
3. Revising the concept plan to identify the future development area as Lot 14.
4. Meeting all applicable requirements of the Knox County Department of Engineering and Public Works.
5. Certification on the final plat by the applicant's surveyor that there is 300 feet of sight distance in both directions along Nubbin Ridge Rd.
6. Place a note on the final plat that all lots will have access only to the internal street system.
7. Meeting all requirements of the approved use on review development plan.
8. A final plat application based on this concept plan will not be accepted for review by the MPC until certification of design plan approval has been submitted to the MPC staff.